Hare & Tortoise

An interior refurbishment issued to us as a shell and core fit out during the time that the Brunswick Centre saw an extensive redevelopment of the multi use complex.

This complete interior fit out included the design and installation of all Mechanical and Electrical schemes, inclusive of a specialist twin pump foul drainage system, alterations to existing sprinkler systems, a complete remodel and finish of toilet areas and all kitchen/restaurant HVAC requirements.  Goods lifts specified ensures H&S compliance, which required the accurate diamond sawing, safe removal and structural trimming of reinforced concrete floor pans over 3 floors.  Internal decorative glazed partitions divided the internal space with a minimalistic glass facade between structural columns, closing the fabric of the building from the external elements.   Walk in refrigerated cold rooms and freezers were both installed along with substantial kitchen, prep and wash up area  stainless steel benching and fitments.

Get In Touch

Call us on +44 (0)1280 821282 and we will get back in touch.